|
Post by Danny Creasy on Jul 22, 2017 6:07:23 GMT -6
I haven't made it out to the range since the work has been completed, so the temporarily moved concrete bench may already be back in place. However, if not, please note that it needs to be placed next to the 50 yard benches not in its former location sandwiched between the 100 and 200 (185) yard ranges. In case I miss a too be announced work session, a half inch concrete drill bit will be required to drill holes in our pad so that we can insert the steel spikes protruding from the bottom of the subject bench's concrete block piers.
|
|