Post by Dwight Pilkilton on Sept 4, 2015 21:09:34 GMT -6
We finally found a contractor who will start on our road. He plans on starting in the next two weeks to first grade our road and then take steps to stop or at least greatly reduce the amount of water erosion we have been experiencing. PLease do not think we have been lax in getting out road repaired, quite the contrary we have been truing to find someone for well over a year to repair our road but no one seemed to want the job.
Look for improvements soon
Sincerely
Dwight Pilkilton
|
|
|
Post by tyler on Sept 5, 2015 16:52:05 GMT -6
Great to hear, thanks for the update!
|
|
|
Post by Jim Watson on Sept 8, 2015 15:33:05 GMT -6
The road in was substantially improved on Sunday 9/6/15 and the guy was still working on it. Looks like it will be accessible by BMW if not Porsche. No problem for an All Terrain Corvette, of course.
Looking forward to replacing the coarse rock on the pistol bays with finer stuff that will pack hard. My feet were aching from clomping around on large wobbly rocks.
|
|
|
Post by Danny Creasy on Sept 8, 2015 17:42:07 GMT -6
Yes, there is no sign left of that nasty washout that formerly greeted us at the gate. Good job, Ulus and Dwight!
|
|
|
Post by Dwight Pilkilton on Sept 9, 2015 23:35:31 GMT -6
THanks guys, getting this done has been like pulling teeth..........through a keyhole
|
|